A120 Stansted to Braintree Reinforced Drainage Swales

Feb 13, 2008 - 2:34:23 PM
«BACK

 

Project
A120 Stansted to Braintree Reinforced Drainage Swales

Product:   
23.5 km (70,000m2) of C350 lining to drainage channels as alternative to slip formed concrete.

Client:      
Balfour Beatty for the Highways Agency

A120 Stansted to Braintree Reinforced Drainage Swales A120 Stansted to Braintree Reinforced Drainage Swales
A120 Stansted to Braintree Reinforced Drainage Swales


sm_logo
 
  PROJECT BY SALIX